Sales and planning applications at this postcode, most recent first.
Apr 2025 · PLANNING
Replacement of existing ground floor doors to front elevation; re-glazing and refurbishment of existing ground floor shopfront window and fan light to front elevation.
Final Decision2025/0416/P
Apr 2025 · PLANNING
Replacement of existing ground floor doors to front elevation; re-glazing and refurbishment of existing ground floor shopfront window and fan light to front elevation; repairs to window to rear elevation; and installation of internal timber staircase from basement to ground floor.
Final Decision2025/0990/L
Feb 2025 · PLANNING
Display of double-sided digital screens to new bus shelter structure.
Final Decision2024/5628/A
Feb 2025 · PLANNING
Display of double-sided digital screens to new bus shelter structure.
Final Decision2024/5624/A
Jan 2025 · PLANNING
Extension of existing rooftop plant enclosure at second floor level and installation of new external plant equipment to roof including 5x new condensers and 1x replacement condenser
Final Decision2024/0006/P
Dec 2024 · PLANNING
Change of use from Class E to Sui Generis (hot food takeaway). Shopfront alterations and new window to Saffron Hill elevation.
Final Decision2024/3185/P
Nov 2024 · PLANNING
Replacement of existing aluminium windows and doors on the rear and side elevations at ground and first floor levels and the reinstatement of 2 historic window openings on the rear elevations.
Final Decision2024/3950/P
Oct 2024 · PLANNING
Display of a 6m height x 3.5m width wall-mounted digital billboard
Appeal Decided2024/3234/A
Oct 2024 · PLANNING
Display of illuminated content on digital screens integrated within new communication Hub.
Appeal Decided2024/3450/A
Oct 2024 · PLANNING
Installation of a Pulse Smart Hub with integrated digital screens and emergency functionality including provision of defibrillators.
Appeal Decided2024/3310/P
Oct 2024 · PLANNING
Installation of a Pulse Smart Hub with integrated digital screens and emergency functionality including provision of defibrillators.
Appeal Decided2024/3311/P
Oct 2024 · PLANNING
Display of illuminated content on digital screens integrated within new communication Hub.
Appeal Lodged2024/3446/A
Aug 2024 · PLANNING
Placement of existing air conditioning units to the first floor for a temporary period of 6 months with the construction of an acoustic surround. Then relocation of Units to new external plant roof space.
Final Decision2024/1621/P
Jul 2024 · PLANNING
Details to discharge Condition 4a (Windows, External Doors & Grills), Condition 4b (Manufacturer's Details of Materials) and Condition 6 (Green Roof) of planning reference 2020/0751/P dated 04/12/23 for Demolition of existing roof extension and erection of new part two storey roof extension, alterations to Back Hill entrance and associated works.
Final Decision2023/1507/P
Jun 2024 · PLANNING
Display of one internally illuminated sign set within canopy (Retrospective).
Final Decision2024/1141/A
Jun 2024 · PLANNING
Installation of a canopy above existing entrance door and associated alteration to entrance (Retrospective).
Final Decision2023/5425/P
Mar 2024 · PLANNING
Proposed works to include like-for-like replacement roofs; replacement rooflights; replacement plant equiptment at roof level; installation of lourvre panels to rear elevation; installation of vent covers to side elevation; installation or external light fittings to front elevation; associated exterior works.
Withdrawn2023/4049/P
Mar 2024 · PLANNING
Installation of 1x internally illuminated box fascia sign, 1x non-illuminated projecting sign, and 1x non-illuminated fascia sign.
Withdrawn2023/4854/A
Feb 2024 · PLANNING
Details of hard and soft landscaping required by condition 7 of planning permission 2020/0984/P dated 12/01/2021 which itself varied 2018/6016/P dated 02/01/2020 (for erection of an 8 storey building comprising a 153 bed hotel with ancillary ground floor restaurant/cafe facilities and 9 flats, together with the refurbishment of 18 Vine Hill and the erection of a 3 storey extension to provide additional office accommodation).
Final Decision2023/2330/P
Feb 2024 · PLANNING
Amendments to the orientation of the acoustic enclosure and stair access on the roof of the ground floor rear extension, reconfiguration of the louvre within the first floor window on the eastern elevation and change to the materials of gate as a variation to condition 3 (approved plans) and condition 7 (details of gates) of planning permission ref 2022/0342/P dated 12/10/2022 as amended by a variation to 2021/1150/P dated 05/10/2021 (External alterations to the existing building including new rooflights and 4 air conditioning units with lowering of the roof of no. 7 Warner Yard, 4 air conditioning units with associated timber enclosure within the courtyard, replacement windows, creation of new entrance on Vine Hill and Warner Yard, enlargement of existing lower ground and upper ground floor openings on the Vine Hill, Warner Yard and courtyard elevations, infilling of lightwell and installation of pavement lights fronting Rosebery Avenue, creation of bin store area to main entrances, new cycle parking, landscaping of the courtyard and other minor works)
Final Decision2023/4331/P
Sources: HM Land Registry Price Paid · planning.data.gov.uk · matched by postcode (street-level, not house-level).